1.4: Three Phase Power Supply Installation ( External & Internal )As per NCVT norms, the quantum of three phase electric power supply required is 88.00 KW as mentioned below:
| 1 |
Fitter |
3.52 |
| 2 |
Electrician |
5.01 |
| 3 |
Plumber |
6.82 |
| 4 |
Foundryman |
11.00 |
| 5 |
Mechanic Motor Vehicle |
4.80 |
| 6 |
Data Entry Operator |
4.10 |
| 7 |
Sanitary Hardware Fitter |
3.00 |
| 8 |
Driver-cum-Mechanic (LMV) |
3.00 |
| 9 |
Load connection to hostel, staff colony, administrative area, premises, etc. |
20.00 |
| |
Total |
61.29 or 63Kw |
1.5: Tools & Equipment
In order to maintain quality of training uniformly across the country, DGE&T, New Delhi have prescribed the list of tools and equipment in the corresponding course curriculum of different trades. The procurement of tools & equipment shall be made as per the DGET approved list. All the tools and equipments are to be procured by July’2010 and Standing Committee inspection conducted within that period to ensure all the trades and units are affiliated to NCVT,New Delhi w.e.f Aug’2010.
1.6: Furniture
The requirement of furniture for operationalising above trades training in Industrial Training Institute has been prescribed by DGE&T, New Delhi. The procurement of furniture shall be made as per the DGET approved list.
1.7: Library
Institutional Library is an important aspect for developing & updating knowledge of staff & trainees of the I.T.I. The Written Instructional Materials developed by NIMI, Chennai, different Engineering Text/ Reference books & journals. Computer Software, LR materials, Audio visual aids, etc. are required to be kept in the Library with its proper furnishing. Adequate quantities of library furniture including books shelves, study tables, chairs, etc. are to be kept in the Library.
1.8: Dispensary
The Industrial Training Institute must have a dispensary with first-aid arrangement for the welfare of the trainees as per DGE&T norms.
1.9: Sanction of posts and Provision of Staff for new I.T.Is:
The staffing pattern of Industrial Training Institute has been prescribed by DGE&T as per following chart.
Principal
(Rs.6500-10,000/-) |
Degree in Engg With 5years experience/ Diploma in Engg. with 8 years of experience. |
01 |
01 |
Group Instructor
(Rs.5500- |
Diploma in Engineering with 5 years experience |
1 : 8 Units |
01 |
Trade Instructor
(Rs.4750/- 7,000/-) |
HNTC/NTC/NAC in
concerned trade |
1 : 1 Unit |
16 |
Drawing Instructor
(Rs.4750-7000/-) |
Diploma in Engg/ Tech |
1:9 Units |
01 |
Math. Instructor
(Rs.4750-7000/-) |
Diploma in Engg ./Tech |
1 : 9 Unit |
01 |
Allied TradeInstructor
(Rs.4750-7000/-) |
HNTC/NTC/NAC in relevant trade |
1 : 250 seats |
01 |
Social Study Instructor
(Rs.4750-7000/-) |
Trained Graduate with English |
1.:1000 seats |
01 |
| Head Clerk |
As Suitable |
|
01 |
| SeniorClerk(Jr.Accountant) |
As Suitable |
|
01 |
Store Keeper
(Rs.4000-6500/-) |
Technically trained |
1 : 250 seats. |
01 |
| Data Entry Operator
(Contractual) |
Graduates |
1 : 50 seats,
3:100 seats, |
02 |
| Workshop Attendant, Peons, Choukidars, Safaiwalla. |
As Suitable |
4:50 seats, 7:100 seats, 11:200seats, 14:250 seats. |
10 |
The promoter has to create the above category of posts both base level and promotional for smooth functioning of new ITI in the Block having no ITI/ITC.
|
2) Total Project Cost. 2.1) Civil Works: Based on the State PWD code, the projected cost of Rs. 3322.00 Lakhs of Civil works to be undertaken for construction of new Industrial Training Institute in the naxal infested districts/blocks as per following particulars.
| 1 |
Workshop Area |
7177sq.ft. |
82.00 |
| 2 |
Administrative building |
7270 sq.ft. |
47.00 |
| 3 |
Hostel (Boy’s 70 seated & girls 30 seated) |
20703 sq.ft. |
100.00 |
| 4 |
Staff Quarters |
7860 Sft |
50.00 |
| 5 |
Compound Wall |
6000 rft. |
30.00 |
| 6 |
Bore Well |
04 nos. |
10.00 |
| 7 |
Sewerage , Internal Road |
Standard |
8.00 |
| 8 |
Three Phase Power Supply |
63 KW |
5.00 |
| |
Total |
|
332.00 |
b) Tools and Equipments and furniture:
Based on the standard rates of tools and equipment, furniture, etc. a sum of Rs. 106.00 Lakhs has been projected as per following particulars for one proposed new Industrial Training Institute.
| 1 |
Fitter |
6.00 |
| 2 |
Electrician |
7.00 |
| 3 |
Plumber |
06.00 |
| 4 |
Foundryman |
8.00 |
| 5 |
Mechanic Motor Vehicle |
18.00 |
| 6 |
Data Entry Operator |
7.00 |
| 7 |
Sanitary Hardware Fitter |
5.00 |
| 8 |
Driver-cum-Mechanic (LMV) |
12.00 |
| |
Sub-Total |
79.00 |
| 9 |
Furniture & Fixture |
8.00 |
| 10 |
Computers & peripherals |
2.00 |
| 11 |
Library Books |
2.00 |
| 12 |
Installation & Other charges |
15.00 |
| |
Sub-Total |
27.00 |
| |
Total |
96.00 |
c) Total non-Recurring Cost:
| Civil Works |
Rs. 332.00. Lakhs |
| Tools and equipment |
Rs. 96.00 Lakhs |
| Total |
Rs. 428.00 Lakhs |
| |
| 2.2). Recurring Expenditure for one year (during 1st. year): |
| i |
Salaries |
Rs. 19.00 Lakhs |
| ii |
Salaries for consolidated pay posts |
Rs.1.73 Lakhs. |
| iii |
T.E. |
Rs. 0.20 Lakh |
| iv |
O.E. |
Rs. 0.20 Lakh |
| v |
Telephone charge |
Rs. 0.50 Lakh |
| vi |
Water charges |
Rs. 0.20 Lakh |
| vii |
Other Contingency |
Rs. 1.00 Lakh |
| viii |
Materials & supplies |
Rs.2.28 Lakh |
| ix |
Maintenance Works |
Rs. 0.10 Lakhs |
| x |
Other Charges |
Rs. 0.50 Lakh |
| xi |
Stipend |
Rs. 0.20 Lakhs |
| |
Total |
Rs. 26.00 Lakhs |
|
| |
 |
| |